Full basement remodel in Havre de Grace

We completed a full basement remodel in Havre de Grace, MD. A county permit was pulled and fulfilled. The remodel included the following:

  • Framing
  • Electrical
  • Drywall
  • Paint
  • Trim
  • Doors
  • Full bathroom detail with tile, etc.

Duration: 6 months

Bathroom Renovation in Fallston

We completed a bathroom renovation in Fallston, MD. The renovation included the following:

  • Removed and replaced bathtub
  • Replaced rotted subfloor
  • Installed cement backerboard
  • Framed soap and shampoo niches
  • Installed large type tile with marble sills
  • Installed shower door
  • Installed floor tile with threshold